This project was completed on December 21, 2004 (within contract required time), the initial commissioning is successful and the qualified AN product was produced. This project obtained State EPC Contracting Gold Key Prize and chosen among the 3rd session of excellent engineering project management and excellent EPC contracting projects, which was held by China Survey & Design Association and China Engineering Consultation Association.