Hydrogenation Reactor Fabrication Experience | ||||||
No. | Client and Project Title | Spec(mm) | Material | Unit Weight(T) | Q'ty | Ex-factory Date |
1 | SPC Refinery Revamping Project Hydro-treating Reactor | ID4600×9000×146+6.5 |
Build up welding E309L+E347、12Cr2Mo1R(H) Plate welding structure |
290 | 1 | 2014-05-31 |
2 | WEPEC(Dalian West Pacific Petrochemical Company) 1,500,000t/y Continuous Reforming Plant Pre-hydrogenation Reactor | ID3400*11518*(3+26)/(3+42) | 41.1 | 1 | 2014-04-15 | |
3 | Ningbo Zhongjin Petrochemical Aromatics project 3 Combined with P-xylene Plant Pre-hydrogenation Reactor | ID4600×4400×64+3 | 14Cr1MoR+S11306 | 99 | 1 | 2013-12-15 |
4 | Ningbo Zhongjin Petrochemical Aromatics project 3 Combined with P-xylene Plant Naphtha Hydro-treating Reactor | ID1900×38700×38+3 | 15CrMoR(H)+S32168 | 100 | 1 | 2013-12-15 |
5 | 100000 tons/year MTBE Device of Shanghai Petrochemical Oil Refining Revolution Plant | ID2400×55min/(55)×16550/15CrMoR(H) | 15CrMoR | 518 | 1 | 2011-12-31 |
6 | 1700000 tons/year Naphtha Hydro Treating Plant of Shanghai Petrochemical | ID3200×(30+3)Min/(42+3) ×19590 | 15GrMoR(H)+S32168 | 74 | 1 | 2011-10-30 |
7 | SINOPEC Jiujiang Branch 150 x104 t/y Diesel Hydrogenation Plant | Ф4400×25600×(160+6.5) | 2.25Cr-1Mo+Surfacing Weld | 430 | 1 | 2011-04-30 |
8 | SINOPEC Changling Branch 240 x104 t/y Gas Diesel Hydrogenation Plant | Ф4200×22300×(124+6.5) | 12Cr2Mo1R(H)+ Surfacing Weld | 270 | 1 | 2010-03-31 |
Main Equipment Fabrication Experience in Coal Chemical Plants | ||||||||
No. | Client and Project Title | Equipment Title | Spec(mm) | Material | Unit Weight(T) | Delivery Status | Q'ty | Completion Date |
1 | Zhongtian co-founder Ordos coal deep processing demonstration project | Condensate stripper | φ1400/φ2000*41055*12/14 /16/20/22 | S30403 | 43.81 | Integral | 2 | 2015-8-31 |
2 | Two stage flash tower | φ3600*23330*(16+4) /(30+4) | Q345R+S31603 | 53.39 | Integral | 2 | 2015-8-31 | |
3 | Stripper | ID2500/3600*38140* 12+4/14+4/16+4 | Q345R+S31603 | 63 | Integral | 2 | 2015-8-31 | |
4 | SINOPEC Yangtze Petrochemical Branch Yangtze Petrochemical Coal to Syngas Project | 2# shift converter | ID3600×(75+6)×12693 | 12Cr2Mo1(Build up welding 309L+347L) | 84.85 | Integral | 1 | 2013-3-20 |
5 | Stripper | ID2200*36910*12/14 | 09MnNiDR | 36 | Integral | 1 | 2015-6-20 | |
6 | Coal to Hydrogen Project of SINOPEC Jiujiang Branch | Heat regenerator | ID2800X53566X14/44 | Q245R | 75 | Integral | 1 | 2014-04-01 |
7 | Methanol/water fractionating column | ID1500X26740X12/22 | Q245R | 22.55 | Integral | 1 | 2014-04-01 | |
8 | Tail gas scrubber | ID3200X15900X10 | S30408 | 18.5 | Integral | 1 | 2014-04-01 | |
9 | CO2 stripper /Ammonia stripper |
ID1000/1400/1800 X33950X10/12/8/6 |
S30408 | 18 | Integral | 1 | 2014-04-01 | |
10 | Shenhua Nngxia Coal Group -- 4 million t/y Coal Indirect Liquefaction Project | Methanol synthesis reactor | ID3700×9592TL×55/70 | SA387Gr.11Cl2;Tube sheet SA336F11Cl3+Build up welding heat exchanging tube SA789UNS S31500 | 212.5 | Integral | 2 | 2014-02-12 |
11 | The project of coal made gas from Yangzi Petrochemical Company of Sinopec Yangzi Branch | 2# change furnace | ID3600×(75+6)×12693 | 12Cr2Mo1( build-up welding 309L+347L) | 84.85 | Integral | 1 | 2013-3-20 |
12 | Shenhua Group Methanol to Olefin Project | MTP reactor |
ID11700*33000*16 /22/24/26/28/32 |
S32168 | 680 | Integral | 3 | 2012-11-30 |
13 | Shenhua Coal to Oil Chemical Stock, Baotou Coal to Olefin Project 30 x104 t/y PE Plant | PE reactor | Ф5200×59958×60 | 16MnDR | 442 | Integral | 1 | 2009-06-30 |
14 | Shenhua Coal to Oil Chemical StockBaotou Coal to Olefin Project Gasification Plant | Syngas scrubber |
Ф4200×85+4/ 55+4×20429 |
13MnNiMoNbR+00 Cr17Ni14Mo2 |
530 | Integral | 3 | 2008-09-01 |
Coke Column Fabrication Experience | ||||||||
No. | Client and Project Title | Spec(mm) | Material | Unit Weigh(T) | Delivery Status | Q'ty | Connection Type between Skirt and Cone | Completion Date |
1 | SINOPEC Shijiazhuang Refinery Branch |
ID6000X30553X(18+3)/
(20+3)/26/28/30 |
14Cr1MoR+S11306 |
110 | Integral | 2 | Humanoid forgings | In Process |
2 | Hi Como (Jiangsu) Needle Coke Technology Co. Ltd. Shin Nihon 50,000t/y Needle Coke Project | ID5000×24455×(3+36) | S11306+ 14Cr1MoR | 130 | Integral | 2 | Humanoid forgings | In Process |
3 | SINOPEC Tahe Branch 5 million t/y Heavy Crude Oil Upgrading Accessory Project 2# Delay Coking Plant Revamping and Expansion |
ID9000×38626×(24+3)/ |
SA387Gr.11CL1+S11306/ SA387Gr.11CL1 |
325 | Piece | 2 | Humanoid forgings | 2013-08-01 |
4 | SINOPEC Beihai Branch 120 x104 t/y Delayed Coking Unit |
ID9000×40142×24+ 3/32/34/36/38/40 |
1.25Cr-0.5Mo-Si/ 1.25Cr-0.5Mo-Si+410S | 310 | Integral | 2 | Humanoid forgings | 2010-11-30 |
5 | India Essar Group Refinery Expanding Works Delayed Coking Unit |
ID9600×41170×24+3/ 27+3/30+3/33+3/36+3/50+3 |
SA387Gr11Cl1/ SA387Gr11Cl1+410S | 386 | Integral | 6 | Humanoid forgings | 2010-10-20 |
6 | CNOOC Huizhou Refinery 420 x104 t/y Delayed Coking Unit |
ID9800×36600×34/36/ 40/44/30+3/38+3 |
1.25Cr-0.5Mo/ 1.25Cr-0.5Mo+410S | 341 | Integral | 4 | Humanoid forgings | 2008-02-29 |
Other Large Vessels Fabrication Experience | ||||||||
No. | Client and Project Title | Equipment Title | Spec(mm) | Material | Unit Weight(T) | Delivery Status | Q'ty | Completion Date |
1 | Nigeria dangote refinery 20 million tons / year refinery project | Atmospheric pressure tower 101-CC-1001 |
ID12000×93500T/ T×64+3/58+3/50+3/ 42+3/36+3/32+3/32/30/28+3 Skirt: L13700×54/64 |
SA516Gr70+317L/ SA516Gr70/ SA516Gr70+AL6XN |
2197 | Integral | 1 | In Process |
2 | Preflash tower 101-CC-1005 |
ID10000/3300×26500T/ T ×34/20/16+3Bottom Head: 42min Skirt: L12200×18 |
SA516Gr70/ SA516Gr70+AL6XN |
316 | Integral | 1 | In Process | |
3 | Main Tower 112-CC-1001 |
ID11000×50400T/ T ×82+3/76+3/64/52/40/32 Skirt: L3000×76 |
SA387Gr11CL1+410 Sor 405/ SA516Gr70 |
1300 | Integral | 1 | In Process | |
4 | C3 Separation tower 114-CC-1003 |
ID8200×90100T/T ×48/42/36 Skirt L9100×60/48 |
SA516Gr70 | 1240 | Integral | 1 | In Process | |
5 | Product fractionator 121-CC-2003 |
ID7100×28700T/T ×26 Skirt L13200×22 |
SA516Gr70 | 275 | Integral | 1 | In Process | |
6 | Stripper151-CC-1001 | ID7300/4600×44100T/ T ×60/66/40 Lower head 70min Skirt L14900×28 | SA516Gr60normalizing | 583.5 | Integral | 1 | in process | |
7 | Naphtha separation tower 151-CC-1002 |
ID8700×61450T/T ×36/30 Skirt L10500×32/36 |
SA516Gr70 | 699 | Integral | 1 | In Process | |
8 | Dehexane tower 155-CC-1004 |
ID12000×62170T/T ×40/36 Skirt L8100 |
SA516Gr70 | 1119 | Integral | 1 | In Process | |
9 | Russian gas oil Russian gas oil Omsk oil refinery CDU/VDU joint unit | Dehexane tower | ID6100X70720T/T X22 | SA516Gr70 | 327.17 | Integral | 1 | In Process |
10 | Flash tank | ID7350X16000T/T X27/22 | SA516Gr70 | 128.89 | Integral | 1 | In Process | |
11 | 1 million t/y Ethylene plant of CNOOC Huizhou Refinery (Phase II ) | Propylene tower | ID8800X120470X76/50 | Q345R | 2100 | Integral | 1 | In Process |
12 | 10 million t/y Atmospheric and Vacuum Distillation(Phase II) Plant of CNOOC Refining Co., LTD | Atmospheric and Vacuum Tower |
ID7800×65150× (3+28)/(3+26) /(3+26) |
S30403+Q345R/UNS N08367+Q345R | 466 | Integral | 1 | In Process |
13 | Electric Desalting System Innovation of SINOPEC Zhenhai Refining Branch | Electric Desalting Tank | ID5000X38500X44 | Q345R | 280 | Integral | 2 | 2014-12-31 |
14 | Combined Fuel Oil Seperation Plant of Zhongjin Petrochemical Co., LTD | Vacuum Tower | 28+3/24+3/22+3/18 |
Q345R+S31603/Q345R+
S11306/Q345R+S30403 |
358.93 | Integral | 1 | 2014-05-31 |
15 | Ningbo Zhongjin Petrochemical Aromatics project 3 Combination | Adsorption tower |
ID7600×28080×60 /80OD910 |
Q345R | 343 | Integral | 4 | 2014-02-28 |
16 | Raffinate Tower | ID12600×81744×32/34 | Q345R | 1150 | Integral above foundation | 1 | 2014-04-30 | |
17 | Xylene tower |
ID10600/11600 ×62194×44/84/46 |
Q345R | 1100 | Integral above foundation | 1 | 2014-04-30 | |
18 | 600000 tons/year P-Xylene Project of Sinopec Hainan Refinery Integration Company | P-Xylene Tower |
ID11800/10600/9800 |
Q345R | 3987 | Ex-factory by piece, integral Delivery at site | 1 | 2013-05-20 |
19 |
Sinopec Quanzhou Petrochemical Co., Ltd.12000000 tons/year Oil Refining Project750000 tons/year Gas Fractional Unit |
Propylene Tower A | ID6800×71250×62 | Q345R | 794.78 | Integral Delivery | 1 | 2012-10-31 |
20 | Propylene Tower B | ID6800×73400×62 | Q345R | 816.03 | Integral Delivery | 1 | 2012-10-31 | |
21 | Sinopec Anqing (Branch) Company Joint-venture Project | Atmospheric Tower | ID5600×56250×(3+20) |
Q345R+N08367 /Q345R+S31603 |
209 | Group Welding by section at site | 1 | 2012-03-30 |
22 | Vacuum Tower |
ID5800/8200/4800/3000 ×47900×(3+20)/(3+26) /(3+32)/(3+18) |
Q345R+S11306 /Q345R+S31603 |
307 | Group Welding by section at site | 1 | 2012-02-28 | |
23 | Catalytic Fractionating Tower | ID6000×53550×30/32 | Q345R | 276 | Group Welding by section at site | 1 | 2012-02-28 | |
24 | 3500000 tons/year Heavy Oil Catalytic Cracking Unit of Shanghai Petrochemical Co., Ltd.- the six period of Oil Refining Revolution Project | The Reaction Setting Vessel |
ID9600/7400/5200 ×634935×54/30/28 |
Q345R | 232.8 | Integral Delivery | 1 | 2012-01-30 |
25 | Regenerator |
ID14300/10800/7700 ×54396×36/46/36/26 |
Q345R | 600 | Integral Delivery | 1 | 2012-01-30 | |
26 | Fractionating Tower |
ID7000×53950 ×(36+3)/(24+3)/28 |
Q345R+S11306 | 350 | Integral Delivery | 1 | 2012-01-30 | |
27 | SINOPEC Wuhan Branch80 x104 t/y PE Works 80 x104 t/y PE Plant 420 x104 t/y(including cryogenic tank) | 2# Propylene Column C-407 | ID7000 ×102450×54 | Q345R Normalizing | 1040 | Integral | 1 | 2011-08-05 |
28 | ZRCC100 x104 t/y PE Project PE Plant | 2# Propylene Rectifying Column | ID7800×109850×58 | 16MnR | 1320 | Integral on the basis of delivery per 4 pieces at site | 1 | 2008-12-05 |
29 | SINOPEC Beihai Branch 500 x104 t/y Crude Oil Pre-treatment Plant | Atmospheric distillation tower |
Ф5800/6400×70463 ×16+3/20+3/22+3 |
Q345R+022Cr17 Ni12Mo2 /Q345R+06Cr13Al |
353 | Integral by group welding on the basis of delivery per 4 pieces at site | 1 | 2010-04-30 |
30 | Vacuum tower |
Ф6400/9800/4000× 52418×26+3/24+3/ 18+3/14+3 |
Q345R+022Cr17 Ni12Mo2 /Q345R+06Cr13Al |
393 | Integral by group welding on the basis of delivery per 3 pieces at site | 1 | 2010-04-30 | |
31 | Tenglong Olefin (Zhangzhou) Co., Ltd80 x104 t/y PX and Accessory Works Olefin Combination plant 9 sets of large column | Xylene distillation column |
ID8800/7400/6800× 120650×91/83/80/54 /52/44/42/36 |
16MnR | 1190 | Integral | 2 | 2010-12-01 |
32 | Hainan Yisheng Petrochemical Company 200 x104 t/y PTA Plant 11 sets of equipment | Solvent dehydration tower |
ID7600×69650×20 /18/16/14 |
S32205 | 320 | Integral | 1 | 2011-10-31 |
Special Heat Exchanger Fabrication Experience | |||||||
No. | Client and Project Title | Equipment Title | Spec(mm) | Material | Unit Weight(T) | Q'ty | Completion Date |
1 | Shanghai SECCO 260,000t/y AN Plant | Reaction gas cooler | BEMID2800X7000 | 1Cr-0.5Mo | 119.95 | 2 | 2014-04-30 |
2 | Fujian Refining Ethylene Project | EO Refining Tower Condenser | ID3800×20 | S30408 | 195 | 1 | 2014-06-30 |
3 | Ningbo Haiyue new materials Co., Ltd. -- Propane and Mixed C4 Utilization Project PDH Plant | Product separator 1# reboiler | ID2500×10324×24 | 09MnNiDR/09MnD | 73.98 | 1 | 2013-11-10 |
4 | SINOPEC ZRCC Branch Three Coking Plant | Raw oil heat exchanger |
ID1300/1400×22+ 3×8763.5 |
Q345R+S11306/0Cr18Ni9 | 108 | 4 | 2013-10-30 |
5 |
China Coal Shanxi Yulin Energy Chemical Co., Ltd.300000 tons/year PE Project |
Cycle Gas Cooler |
ID1335/Φ2200× 21343×36/25 |
Q345R/10 | 248.54 | 1 | 2012-10-30 |
6 | Sinopec Yangzi Petrochemical Company Ethylene Energy Saving Revolution Project | Demethanizing Column Feed Chiller | ID1400/2100×18×9259 | 09MnNiDR/09MnNiD | 26.675 | 1 | 2012-06-30 |
7 |
Ethylene Rectification Tower No.2 Intermediate Reboiler |
ID1200/2000×20×11338 | 09MnNiDR/09MnNiD | 28.64 | 1 | 2012-06-30 | |
8 | SINOPEC Wuhan Branch | Circulation gas cooler (E4002AS) | Φ2400×24×23186 | Q345R/SA179 | 136.5 | 1 | 2011-11-01 |
9 | Anqing Branch 100 x104 t/y Catalytic Reforming Plant | Reforming feed heat exchanger | Ф2900×19000×32 | 1.25 Cr-0.5 Mo | 120 | 1 | 2011-12-06 |
10 | Jiujiang Branch 120 x104 t/y Continuous Reforming Plant- Benzene extraction unit | Reforming feed plate heat exchanger | Ф2900×15500×32 | 1.25 Cr-0.5 Mo | 130 | 1 | 2011-10-16 |
Export Equipment Experience | ||||||||
No. | Client and Project Title | Equipment Title | Spec(mm) | Material | Unit Weight(T) | Delivery Status | Q'ty | Completion Date |
1 | Nigeria dangote refinery 20 million tons / year refinery project | Atmospheric pressure tower 101-CC-1001 |
ID12000×93500T/ T×64+3/58+3/50+3/42+3 /36+3/32+3/32/30/28+3 Skirt: L13700×54/64 |
SA516Gr70+317L/ SA516Gr70/ SA516Gr70+AL6XN | 2197 | Integral | 1 | In Process |
2 | Preflash tower 101-CC-1005 |
ID10000/3300×26500T/ T ×34/20/16+3 Bottom Head: 42min Skirt: L12200×18 |
SA516Gr70/ SA516Gr70+AL6XN | 316 | Integral | 1 | In Process | |
3 | Main Tower 112-CC-1001 |
ID11000×50400T/ T×82+3/76+3/64/52/40/32 Skirt: L3000×76 |
SA387Gr11CL1+410 Sor 405/ SA516Gr70 |
1300 | Integral | 1 | In Process | |
4 | C3 Separation tower 114-CC-1003 |
ID8200×90100T/T ×48/42/36 Skirt L9100×60/48 |
SA516Gr70 | 1240 | Integral | 1 | In Process | |
5 | Product fractionator 121-CC-2003 |
ID7100×28700T/T ×26 Skirt L13200×22 |
SA516Gr70 | 275 | Integral | 1 | In Process | |
6 | Stripper 151-CC-1001 |
ID7300/4600×44100T/ T ×60/66/40 Lower head 70min Skirt L14900×28 |
SA516Gr60normalizing | 583.5 | Integral | 1 | In Process | |
7 | Naphtha separation tower 151-CC-1002 |
ID8700×61450T/T ×36/30 Skirt L10500×32/36 |
SA516Gr70 | 699 | Integral | 1 | In Process | |
8 | Dehexane tower 155-CC-1004 |
ID12000×62170T/ T×40/36 Skirt L8100 |
SA516Gr70 | 1119 | Integral | 1 | In Process | |
9 | Russian gas oil Omsk oil refinery CDU/VDU joint unit | Naphtha stabilizer |
ID4900/4400X40660T/ T X27/26 |
SA516Gr70 | 162.35 | Integral | 1 | In Process |
10 | Naphtha separation tower |
ID4900/4300X50180T/ T X20/19/15 |
SA516Gr70 | 165.42 | Integral | 1 | In Process | |
11 | Dehexane tower |
ID6100X70720T/ T X22 |
SA516Gr70 | 327.17 | Integral | 1 | In Process | |
12 | C4 Separation tower |
ID3600X60450T/ T X17/16 |
SA516Gr70 | 128.09 | Integral | 1 | In Process | |
13 | Flash tank |
ID7350X16000T/ T X27/22 |
SA516Gr70 | 128.89 | Integral | 1 | In Process | |
14 | Combined device of deep processing of naphtha for Kazakhstan Atyrau refinery Co., | Oligomer second reactor |
ID4000×13900 (T-T)×150MIN |
SA516 Gr60 | 310 | Integral | 1 | 2015-1-30 |
15 | Oligomer third reactor |
ID4000×13900 (T-T)×150MIN |
SA516 Gr60 | 310 | Integral | 1 | 2015-1-30 | |
16 | Combined device of deep processing of naphtha for Kazakhstan Atyrau refinery Co. (total 8 equipments) | First regenerator |
ID9450/7850×19500 (T-T)×28/30/28 |
SA516Gr70 | 400.7 | Integral | 1 | 2014-7-30 |
17 | Second regenerator |
ID8900/7300×12535 (T-T)×32/58/26 |
SA516Gr70 | 351 | Integral | 1 | 2014-7-30 | |
18 | Reactor settler |
ID8010/5450×26190 (T-T)×26/36 |
SA516Gr70 | 296 | Integral | 1 | 2014-7-30 | |
19 | Sinopec Singapore 80 thousand tons / year lubricating oil project | autoclave | ID1700×5950×24 |
SA 516 Gr70/ SA240-304 |
12.1 | Integral | 2 | 2012-6-15 |
20 | Contact kettle | ID1600/630×5780×24 | SA 516 Gr70 | 9.8 | Integral | 2 | 2012-6-15 | |
21 | Shabik IBN RUSHD IR-II opening 420000 tons / year polyester project container and the heat exchanger 65pcs | CPC Preparation container | φ3000*6100*8/6/10 | 304L | 5.2 | Integral | 1 | 2012-1-31 |
22 | Mist eliminator (DC) | φ3000/1400*7510*12/14 | 304L | 8 | Integral | 2 | 2012-1-31 | |
23 | Vietnam Ningping fertilizer company (coal) chemical fertilizer project 320 thousand tons / year of synthetic ammonia and 560 thousand tons of urea | Absorption tower |
ID3400×74500×60/ 54/60/56 |
SA203 Gr.DS3+S5/ 09MnNiDR |
441 | Integral | 1 | 2010-10-1 |
24 | H2S concentration tower |
ID3000×6865×16/ 14/24/36/46 |
00Cr19Ni10 | 170 | Integral | 1 | 2010-10-1 | |
25 | Delayed coking unit of India Essar group refining expansion project | Coke tower |
ID9600×41170×24+3 /27+3/30+3/33+3 /36+3/50+3 |
SA387Gr11Cl1/ SA387Gr11Cl1+410S |
386 | Integral | 6 | 2010-10-20 |