Hydrogenation Reactor Fabrication Experience
No. Client and Project Title Spec(mm) Material Unit Weight(T) Q'ty Ex-factory Date
1 SPC Refinery Revamping Project Hydro-treating Reactor ID4600×9000×146+6.5 Build up welding E309L+E347、12Cr2Mo1R(H)
Plate welding structure
290 1 2014-05-31
2 WEPEC(Dalian West Pacific Petrochemical Company) 1,500,000t/y Continuous Reforming Plant Pre-hydrogenation Reactor ID3400*11518*(3+26)/(3+42)   41.1 1 2014-04-15
3 Ningbo Zhongjin Petrochemical Aromatics project 3 Combined with P-xylene Plant Pre-hydrogenation Reactor ID4600×4400×64+3 14Cr1MoR+S11306 99 1 2013-12-15
4 Ningbo Zhongjin Petrochemical Aromatics project 3 Combined with P-xylene Plant Naphtha Hydro-treating Reactor ID1900×38700×38+3 15CrMoR(H)+S32168 100 1 2013-12-15
5 100000 tons/year MTBE Device of Shanghai Petrochemical Oil Refining Revolution Plant ID2400×55min/(55)×16550/15CrMoR(H) 15CrMoR 518 1 2011-12-31
6 1700000 tons/year Naphtha Hydro Treating Plant of Shanghai Petrochemical ID3200×(30+3)Min/(42+3) ×19590 15GrMoR(H)+S32168 74 1 2011-10-30
7 SINOPEC Jiujiang Branch 150 x104 t/y Diesel Hydrogenation Plant Ф4400×25600×(160+6.5) 2.25Cr-1Mo+Surfacing Weld 430 1 2011-04-30
8 SINOPEC Changling Branch 240 x104 t/y Gas Diesel Hydrogenation Plant Ф4200×22300×(124+6.5) 12Cr2Mo1R(H)+ Surfacing Weld 270 1 2010-03-31


Main Equipment Fabrication Experience in Coal Chemical Plants
No. Client and Project Title Equipment Title Spec(mm) Material Unit Weight(T) Delivery Status Q'ty Completion Date
1 Zhongtian co-founder Ordos coal deep processing demonstration project Condensate stripper φ1400/φ2000*41055*12/14 /16/20/22 S30403 43.81 Integral 2 2015-8-31
2 Two stage flash tower φ3600*23330*(16+4) /(30+4) Q345R+S31603 53.39 Integral 2 2015-8-31
3 Stripper ID2500/3600*38140* 12+4/14+4/16+4 Q345R+S31603 63 Integral 2 2015-8-31
4 SINOPEC Yangtze Petrochemical Branch Yangtze Petrochemical Coal to Syngas Project 2# shift converter ID3600×(75+6)×12693 12Cr2Mo1(Build up welding 309L+347L) 84.85 Integral 1 2013-3-20
5 Stripper ID2200*36910*12/14 09MnNiDR 36 Integral 1 2015-6-20
6 Coal to Hydrogen Project of SINOPEC Jiujiang Branch Heat regenerator ID2800X53566X14/44 Q245R 75 Integral 1 2014-04-01
7 Methanol/water fractionating column ID1500X26740X12/22 Q245R 22.55 Integral 1 2014-04-01
8 Tail gas scrubber ID3200X15900X10 S30408 18.5 Integral 1 2014-04-01
9 CO2 stripper /Ammonia stripper ID1000/1400/1800
X33950X10/12/8/6
S30408 18 Integral 1 2014-04-01
10 Shenhua Nngxia Coal Group -- 4 million t/y Coal Indirect Liquefaction Project Methanol synthesis reactor ID3700×9592TL×55/70 SA387Gr.11Cl2;Tube sheet SA336F11Cl3+Build up welding heat exchanging tube SA789UNS S31500 212.5 Integral 2 2014-02-12
11 The project of coal made gas from Yangzi Petrochemical Company of Sinopec Yangzi Branch 2# change furnace ID3600×(75+6)×12693 12Cr2Mo1( build-up welding 309L+347L) 84.85 Integral 1 2013-3-20
12 Shenhua Group Methanol to Olefin Project MTP reactor ID11700*33000*16
/22/24/26/28/32
S32168 680 Integral 3 2012-11-30
13 Shenhua Coal to Oil Chemical Stock, Baotou Coal to Olefin Project 30 x104 t/y PE Plant PE reactor Ф5200×59958×60 16MnDR 442 Integral 1 2009-06-30
14 Shenhua Coal to Oil Chemical StockBaotou Coal to Olefin Project Gasification Plant Syngas scrubber Ф4200×85+4/
55+4×20429
13MnNiMoNbR+00
Cr17Ni14Mo2
530 Integral 3 2008-09-01


Coke Column Fabrication Experience
No. Client and Project Title Spec(mm) Material Unit Weigh(T) Delivery Status Q'ty Connection Type between Skirt and Cone Completion Date
1 SINOPEC Shijiazhuang Refinery Branch ID6000X30553X(18+3)/

(20+3)/26/28/30

14Cr1MoR+S11306
/14Cr1MoR

110 Integral 2 Humanoid forgings In Process
2 Hi Como (Jiangsu) Needle Coke Technology Co. Ltd. Shin Nihon 50,000t/y Needle Coke Project ID5000×24455×(3+36) S11306+ 14Cr1MoR 130 Integral 2 Humanoid forgings In Process
3 SINOPEC Tahe Branch 5 million t/y Heavy Crude Oil Upgrading Accessory Project 2# Delay Coking Plant Revamping and Expansion

ID9000×38626×(24+3)/
(26+3)/(30+3)/

32/34/36/38/44/3

SA387Gr.11CL1+S11306/

SA387Gr.11CL1
325 Piece 2 Humanoid forgings 2013-08-01
4 SINOPEC Beihai Branch 120 x104 t/y Delayed Coking Unit ID9000×40142×24+
3/32/34/36/38/40
1.25Cr-0.5Mo-Si/ 1.25Cr-0.5Mo-Si+410S 310 Integral 2 Humanoid forgings 2010-11-30
5 India Essar Group Refinery Expanding Works Delayed Coking Unit ID9600×41170×24+3/
27+3/30+3/33+3/36+3/50+3
SA387Gr11Cl1/ SA387Gr11Cl1+410S 386 Integral 6 Humanoid forgings 2010-10-20
6 CNOOC Huizhou Refinery 420 x104 t/y Delayed Coking Unit ID9800×36600×34/36/
40/44/30+3/38+3
1.25Cr-0.5Mo/ 1.25Cr-0.5Mo+410S 341 Integral 4 Humanoid forgings 2008-02-29


Other Large Vessels Fabrication Experience
No. Client and Project Title Equipment Title Spec(mm) Material Unit Weight(T) Delivery Status Q'ty Completion Date
1 Nigeria dangote refinery 20 million tons / year refinery project Atmospheric pressure tower 101-CC-1001 ID12000×93500T/
T×64+3/58+3/50+3/
42+3/36+3/32+3/32/30/28+3
Skirt: L13700×54/64
SA516Gr70+317L/ 
SA516Gr70/ 
SA516Gr70+AL6XN 
2197 Integral 1 In Process
2 Preflash tower 101-CC-1005 ID10000/3300×26500T/
T ×34/20/16+3Bottom 
Head: 42min 
Skirt: L12200×18
SA516Gr70/ 
SA516Gr70+AL6XN  
316 Integral 1 In Process
3 Main Tower 112-CC-1001 ID11000×50400T/
T ×82+3/76+3/64/52/40/32
Skirt: L3000×76
SA387Gr11CL1+410
Sor 405/ SA516Gr70 
1300 Integral 1 In Process
4 C3 Separation tower 114-CC-1003 ID8200×90100T/T
×48/42/36
Skirt L9100×60/48
SA516Gr70 1240 Integral 1 In Process
5 Product fractionator 121-CC-2003 ID7100×28700T/T ×26
Skirt L13200×22
SA516Gr70 275 Integral 1 In Process
6 Stripper151-CC-1001 ID7300/4600×44100T/  T ×60/66/40 Lower head 70min  Skirt L14900×28 SA516Gr60normalizing 583.5 Integral 1 in process
7 Naphtha separation tower  151-CC-1002 ID8700×61450T/T ×36/30
Skirt L10500×32/36
SA516Gr70 699 Integral 1 In Process
8 Dehexane tower 155-CC-1004 ID12000×62170T/T ×40/36
Skirt L8100
SA516Gr70 1119 Integral 1 In Process
9 Russian gas oil Russian gas oil Omsk oil refinery CDU/VDU joint unit Dehexane tower ID6100X70720T/T X22 SA516Gr70 327.17 Integral 1 In Process
10 Flash tank ID7350X16000T/T X27/22 SA516Gr70 128.89 Integral 1 In Process
11 1 million t/y Ethylene plant of CNOOC Huizhou Refinery (Phase II ) Propylene tower ID8800X120470X76/50 Q345R 2100 Integral 1 In Process
12 10 million t/y Atmospheric and Vacuum Distillation(Phase II) Plant of CNOOC Refining Co., LTD Atmospheric and Vacuum Tower ID7800×65150×
(3+28)/(3+26)
/(3+26)
S30403+Q345R/UNS N08367+Q345R 466 Integral 1 In Process
13 Electric Desalting System Innovation of SINOPEC Zhenhai Refining Branch Electric Desalting Tank ID5000X38500X44 Q345R 280 Integral 2 2014-12-31
14 Combined  Fuel Oil Seperation Plant of Zhongjin Petrochemical Co., LTD Vacuum Tower 28+3/24+3/22+3/18 Q345R+S31603/Q345R+

S11306/Q345R+S30403

358.93 Integral 1 2014-05-31
15 Ningbo Zhongjin Petrochemical Aromatics project 3 Combination Adsorption tower ID7600×28080×60
/80OD910
Q345R 343 Integral 4 2014-02-28
16 Raffinate Tower ID12600×81744×32/34 Q345R 1150 Integral above foundation 1 2014-04-30
17 Xylene tower ID10600/11600
×62194×44/84/46
Q345R 1100 Integral above foundation 1 2014-04-30
18 600000 tons/year P-Xylene Project of Sinopec Hainan Refinery Integration Company P-Xylene Tower

ID11800/10600/9800
×124950×118/
114/96/86

Q345R 3987 Ex-factory by piece, integral Delivery at site 1 2013-05-20
19

Sinopec Quanzhou Petrochemical Co., Ltd.12000000 tons/year Oil Refining Project750000 tons/year Gas Fractional Unit

Propylene Tower A ID6800×71250×62 Q345R 794.78 Integral Delivery 1 2012-10-31
20 Propylene Tower B ID6800×73400×62 Q345R 816.03 Integral Delivery 1 2012-10-31
21 Sinopec Anqing (Branch) Company Joint-venture Project Atmospheric Tower ID5600×56250×(3+20) Q345R+N08367
/Q345R+S31603
209 Group Welding by section at site 1 2012-03-30
22 Vacuum Tower ID5800/8200/4800/3000
×47900×(3+20)/(3+26)
/(3+32)/(3+18)
Q345R+S11306
/Q345R+S31603
307 Group Welding by section at site 1 2012-02-28
23 Catalytic Fractionating Tower ID6000×53550×30/32 Q345R 276 Group Welding by section at site 1 2012-02-28
24 3500000 tons/year Heavy Oil Catalytic Cracking Unit of Shanghai Petrochemical Co., Ltd.- the six period of Oil Refining Revolution Project The Reaction Setting Vessel ID9600/7400/5200
×634935×54/30/28
Q345R 232.8 Integral Delivery 1 2012-01-30
25 Regenerator ID14300/10800/7700
×54396×36/46/36/26
Q345R 600 Integral Delivery 1 2012-01-30
26 Fractionating Tower ID7000×53950
×(36+3)/(24+3)/28
Q345R+S11306 350 Integral Delivery 1 2012-01-30
27 SINOPEC Wuhan Branch80 x104 t/y PE Works 80 x104 t/y PE Plant 420 x104 t/y(including cryogenic tank) 2# Propylene Column C-407 ID7000 ×102450×54 Q345R Normalizing 1040 Integral 1 2011-08-05
28 ZRCC100 x104 t/y PE Project PE Plant 2# Propylene Rectifying Column ID7800×109850×58 16MnR 1320 Integral on the basis of delivery per 4 pieces at site 1 2008-12-05
29 SINOPEC Beihai Branch 500 x104 t/y Crude Oil Pre-treatment Plant Atmospheric distillation tower Ф5800/6400×70463
×16+3/20+3/22+3
Q345R+022Cr17
Ni12Mo2
/Q345R+06Cr13Al
353 Integral by group welding on the basis of delivery per 4 pieces at site 1 2010-04-30
30 Vacuum tower Ф6400/9800/4000×
52418×26+3/24+3/
18+3/14+3
Q345R+022Cr17
Ni12Mo2
/Q345R+06Cr13Al
393 Integral by group welding on the basis of delivery per 3 pieces at site 1 2010-04-30
31 Tenglong Olefin (Zhangzhou) Co., Ltd80 x104 t/y PX and Accessory Works Olefin Combination plant 9 sets of large column Xylene distillation column ID8800/7400/6800×
120650×91/83/80/54 
/52/44/42/36
16MnR 1190 Integral 2 2010-12-01
32 Hainan Yisheng Petrochemical Company 200 x104 t/y PTA Plant 11 sets of equipment Solvent dehydration tower ID7600×69650×20
/18/16/14
S32205 320 Integral 1 2011-10-31


Special Heat Exchanger Fabrication Experience
No. Client and Project Title Equipment Title Spec(mm) Material Unit Weight(T) Q'ty Completion Date
1 Shanghai SECCO 260,000t/y AN Plant Reaction gas cooler BEMID2800X7000 1Cr-0.5Mo 119.95 2 2014-04-30
2 Fujian Refining Ethylene Project EO Refining Tower Condenser ID3800×20 S30408 195 1 2014-06-30
3 Ningbo Haiyue new materials Co., Ltd. -- Propane and Mixed C4 Utilization Project PDH Plant Product separator 1# reboiler ID2500×10324×24 09MnNiDR/09MnD 73.98 1 2013-11-10
4 SINOPEC ZRCC Branch Three Coking Plant Raw oil heat exchanger ID1300/1400×22+
3×8763.5
Q345R+S11306/0Cr18Ni9 108 4 2013-10-30
5

China Coal Shanxi Yulin Energy Chemical Co., Ltd.300000 tons/year PE Project

Cycle Gas Cooler ID1335/Φ2200×
21343×36/25
Q345R/10 248.54 1 2012-10-30
6 Sinopec Yangzi Petrochemical Company Ethylene Energy Saving Revolution Project Demethanizing Column Feed Chiller ID1400/2100×18×9259 09MnNiDR/09MnNiD 26.675 1 2012-06-30
7

Ethylene Rectification Tower

No.2 Intermediate Reboiler

ID1200/2000×20×11338 09MnNiDR/09MnNiD 28.64 1 2012-06-30
8 SINOPEC Wuhan Branch Circulation gas cooler (E4002AS) Φ2400×24×23186 Q345R/SA179 136.5 1 2011-11-01
9 Anqing Branch 100 x104 t/y Catalytic Reforming Plant Reforming feed heat exchanger Ф2900×19000×32 1.25 Cr-0.5 Mo 120 1 2011-12-06
10 Jiujiang Branch 120 x104 t/y Continuous Reforming Plant- Benzene extraction unit Reforming feed plate heat exchanger Ф2900×15500×32 1.25 Cr-0.5 Mo 130 1 2011-10-16


Export Equipment Experience
No. Client and Project Title Equipment Title Spec(mm) Material Unit Weight(T) Delivery Status Q'ty Completion Date
1 Nigeria dangote refinery 20 million tons / year refinery project Atmospheric pressure tower 101-CC-1001 ID12000×93500T/
T×64+3/58+3/50+3/42+3
/36+3/32+3/32/30/28+3 
Skirt: L13700×54/64
SA516Gr70+317L/ SA516Gr70/ SA516Gr70+AL6XN 2197 Integral 1 In Process
2 Preflash tower 101-CC-1005 ID10000/3300×26500T/
T ×34/20/16+3
Bottom  Head: 42min 
Skirt: L12200×18
SA516Gr70/ SA516Gr70+AL6XN 316 Integral 1 In Process
3 Main Tower 112-CC-1001 ID11000×50400T/
T×82+3/76+3/64/52/40/32
Skirt: L3000×76
SA387Gr11CL1+410
Sor 405/ SA516Gr70 
1300 Integral 1 In Process
4 C3 Separation tower 114-CC-1003 ID8200×90100T/T ×48/42/36
Skirt L9100×60/48
SA516Gr70 1240 Integral 1 In Process
5 Product fractionator 121-CC-2003 ID7100×28700T/T ×26
Skirt L13200×22
SA516Gr70 275 Integral 1 In Process
6 Stripper 151-CC-1001 ID7300/4600×44100T/
T ×60/66/40
Lower head 70min
Skirt L14900×28
SA516Gr60normalizing 583.5 Integral 1 In Process
7 Naphtha separation tower 151-CC-1002 ID8700×61450T/T ×36/30
Skirt L10500×32/36
SA516Gr70 699 Integral 1 In Process
8 Dehexane tower 155-CC-1004 ID12000×62170T/ T×40/36
Skirt L8100
SA516Gr70 1119 Integral 1 In Process
9 Russian gas oil Omsk oil refinery CDU/VDU joint unit Naphtha stabilizer ID4900/4400X40660T/
T X27/26
SA516Gr70 162.35 Integral 1 In Process
10 Naphtha separation tower  ID4900/4300X50180T/
T X20/19/15
SA516Gr70 165.42 Integral 1 In Process
11 Dehexane tower ID6100X70720T/
T X22
SA516Gr70 327.17 Integral 1 In Process
12 C4 Separation tower ID3600X60450T/
T X17/16
SA516Gr70 128.09 Integral 1 In Process
13 Flash tank ID7350X16000T/
T X27/22
SA516Gr70 128.89 Integral 1 In Process
14 Combined device of deep processing of naphtha for Kazakhstan Atyrau refinery Co.,  Oligomer second reactor ID4000×13900
(T-T)×150MIN
SA516 Gr60 310 Integral 1 2015-1-30
15 Oligomer third reactor ID4000×13900
(T-T)×150MIN
SA516 Gr60 310 Integral 1 2015-1-30
16 Combined device of deep processing of naphtha for Kazakhstan Atyrau refinery Co. (total 8 equipments) First regenerator ID9450/7850×19500
(T-T)×28/30/28
SA516Gr70 400.7 Integral 1 2014-7-30
17 Second regenerator ID8900/7300×12535
(T-T)×32/58/26
SA516Gr70 351 Integral 1 2014-7-30
18 Reactor settler ID8010/5450×26190
(T-T)×26/36
SA516Gr70 296 Integral 1 2014-7-30
19 Sinopec Singapore 80 thousand tons / year lubricating oil project autoclave ID1700×5950×24 SA 516 Gr70/
SA240-304
12.1 Integral 2 2012-6-15
20 Contact kettle ID1600/630×5780×24 SA 516 Gr70 9.8 Integral 2 2012-6-15
21 Shabik IBN RUSHD IR-II opening 420000 tons / year polyester project container and the heat exchanger 65pcs CPC Preparation container φ3000*6100*8/6/10 304L 5.2 Integral 1 2012-1-31
22  Mist eliminator (DC) φ3000/1400*7510*12/14 304L 8 Integral 2 2012-1-31
23 Vietnam Ningping fertilizer company (coal) chemical fertilizer project 320 thousand tons / year of synthetic ammonia and 560 thousand tons of urea Absorption tower ID3400×74500×60/
54/60/56
SA203 Gr.DS3+S5/
09MnNiDR
441 Integral 1 2010-10-1
24 H2S concentration tower ID3000×6865×16/
14/24/36/46
00Cr19Ni10 170 Integral 1 2010-10-1
25 Delayed coking unit of India Essar group refining expansion project Coke tower ID9600×41170×24+3
/27+3/30+3/33+3
/36+3/50+3 
SA387Gr11Cl1/
SA387Gr11Cl1+410S
386 Integral 6 2010-10-20