Home >> Company News

Awarded the EPC turn-key project bid for Qinghai Damei olefin project thermoelectric unit

On May 24th, we received the bid-winning notice on EPC turn-key project for Qinghai Damei olefin project thermoelectric unit. The project is designed to build 3×240t/h high-temp. HP coal-fired CFB boiler and 2×25MW high-temp. HP back pressure extraction turbo generator unit; chemical water unit with gross handling capacity of 600t/h. The proposed acid-base station consists of 2×150m3 concentrated sulphuric acid storage tank and 2×25m3/h sulphuric acid transferring pump, 2×300m3 caustic soda storage tank and 2×20m3/h caustic soda transferring pump.

The acid-base station and chemical water unit as part of EPC turn-key project are expected to complete interim handover by September 18th, 2018, and the thermoelectric unit is expected to complete interim handover by October 18th, 2018.