Experiences in Steam/power Regeneration Works | |||||
No. | Title | Construction by | Capacity(t/h) | Service Scope | Completion |
A | IGCC project | ||||
1 | IGCC project POX/COGEN | SINOPEC Fujian Refinery and Chemical Company | 260MW | Engineering design | 2009 |
2 | IGCC Greengen IGCC | Tianjin Huaneng Group | 250MW | Engineering design | 2009 |
B | Boiler power station | ||||
1 | The second, third production line power center of the first phase project of Shenhua coal direct liquefaction project | SHENHUA | 2 * 100MW condensate air cooled generating set +2 * 100MW pure condensing generator set +4 * 20MW medium pressure waste heat steam condensing Generator + (2+1) x 670t/h high pressure pulverized coal or circulating fluidized bed boiler. | Overall Design Basic Design | In Process |
2 | A New Furnace and Generator Set Project | Balin Petrochemical | 1×410t/h furnace+1×60MW Generator Set | Engineering Design | In Process |
3 | 1700000 tons/year Coal to Methanol and Olefin Conversion Project | Zhongan Joint Coalification Co., Ltd. | 4×465t/h Boiler | Basic Design | In Process |
4 | Thermoelectric Plant | Guangdong Refinery Integration Company | 4×450t/h Boiler+2×100000KW Generator Set | Overall Design | In Process |
FEED | |||||
5 | Ethylene Device Power Boiler Coal Replacing Oil Technical Revolution Project | Qilu Petrochemical Co., Ltd. | 2×410 t/h Boiler+ 1×50MW Generator | Engineering Design | 2015 |
6 | Heat Island Centre Project | Chongqing Chemical and Pharmaceutical Holdings Group | 5×490t/h Boiler+2×125MW Generator Set+2×30MW Generator Set | Engineering Design | 2015 |
7 | Power Plant Reconstruction | Xian Petrochemical (Branch) Company | 2×75t/h Boiler+1×12MW Generator Set | EPC | 2014 |
8 | The First Phase of Power Boiler System Integration Project | Sinopec Yanshan (Branch) Company | 1×410t/h Boiler+1×50MW Generator Set | Engineering Design | 2014 |
9 | Accessory boiler Project for Ethylene Modification | Yangtze Petrochemical Company | 3×540 t/h boiler+ 2 x 50 mw generator set | Feasible study | 2014 |
10 | Coal to Hydrogenation boiler and Power Generation Plant | SINOPEC Maoming Petrochemical Company | 1 x 410 t/h boiler + 1 x 40 mw generator set | Engineering design | 2014 |
11 |
SINOPEC Yanshan Petrochemical Boiler System (Phase II) |
Sinopec Yanshan (Branch) Company | 3×410t/h High Pressure CFB Boiler | Feasible study | 2014 |
12 | One Boiler One Conveyer Project | Baling Petrochemical Co., Ltd. | 1×410t/h Boiler+1×60MW Generator Set | Engineering Design | 2013 |
13 | Coal Coke Substitute for Oil Revamping Project | SINOPEC Jiujiang Branch | 2 x 220 t/h boiler+ 1 x 50 mw generator set | EPC | 2013 |
14 |
Steam/power co-generation plant |
SINOPEC Wuhan Company Branch | 3×360t/h High Pressure CFB Boiler | Engineering design | 2013 |
15 |
Power Station of Methanol to Hydrocarbon | Shenhua Ningxia Coal Group | 4 x 280 t/h boiler + 1 + 1 x 50 mw steam turbing generator+1 x 60MW generator | Engineering design | 2012 |
16 |
Thermal power engineering |
SINOPEC Tianjin Petrochemical Company | 3×420 boiler +2×100 MW power generator set | Engineering design | 2009 |
17 | Phase 2 oil products quality update-thermal power station revamping | SINOPEC Luoyang Petrochemical Company | 3, 10 boiler +25MW power generator set | Feasible study | 2009 |
Engineering design | |||||
18 | Boiler and power generation | SINOPEC Maoming Petrochemical Company | 2×310 boiler +2×50 MW power generator set | Engineering design | 2009 |
19 | Boiler and power generation | SINOPEC Sichuan Vinylon Factory | 2×460 boiler+25 MW power generator+50 MW power generator | Engineering design | 2008 |
20 | Ethylene power center | SINOPEC ZRCC | 5×410(CFB)+4×100MW | Feasible study | 2008 |
Engineering design | |||||
21 | Thermal power station revamping | SINOPEC Luoyang Petrochemical Company | 310(CFB)、50MW、60MW | Feasible study | 2008 |
Engineering design | |||||
22 | Qingdao refinery power center | Qingdao Refinery Chemical Co., Ltd | 2×310(CFB)+2×25MW | Overall design | 2007 |
2×60MW | Engineering design | ||||
23 | Boiler and power generation | Liuzhou Chemical Co., Ltd | 2×130(CFB)+2×25MW | Feasible study | 2007 |
Engineering design | |||||
24 | 6# boiler | SINOPEC Anqing Petrochemical Thermal Power Station | 410 (PC) | Feasible study | 2007 |
Engineering design |