Main Experiences in Gasification Works by Different Feedstock
|
No.
|
Title
|
Construction by
|
(kt/a)Capacity
|
Service Scope
|
Completion
|
A
|
Fertilizer Works
|
|
|
|
|
1
|
Urea Project
|
CNOOC Hualu Shanxi Coal Chemical Co., Ltd
|
520 Urea
|
Basic Engineering
|
2014
|
2
|
Urea project
|
Erdos Yiding Coal Chemical Liability Co., Ltd
|
Synthetic Ammonia 300, Urea 520
|
EPC
|
2014
|
3
|
Urea project
|
CNOOC Inner Mongolia Tianye
|
Synthesis ammonia 350, urea 600
|
Feasible study
|
2009
|
4
|
Fertilizer relocation
|
SINOPEC Dazhou Company
|
Synthesis ammonia 300, urea 520
|
Engineering design
|
2009
|
5
|
Fertilizer relocation
|
SINOPEC Jinlin Petrochemical Company
|
Synthesis ammonia 300, urea 520
|
Feasible study
|
2009
|
6
|
First fertilizer plant energy saving and revamping
|
Petrol China Ningxia Petrochemical Company Branch
|
Synthesis ammonia 300, urea 520
|
Engineering design
|
2008
|
7
|
Resource optimization works
|
SINOPEC Qilu Company Branch
|
10x104m³/h effective gas
|
Engineering design
|
2007
|
8
|
Coal to oil revamping
|
SINOPEC Hubei Fertilizer Company Branch
|
Synthesis ammonia 300
|
Feasible study
|
2007
|
Engineering design
|
9
|
Gas to oil works
|
Petrol China Jilin Company Branch
|
Synthesis ammonia 300, urea 520
|
Feasible study
|
2007
|
10
|
First fertilizer plant increase production 50%
|
SINOPEC Qilu Company Branch
|
Synthesis ammonia 450, urea 780
|
Feasible study
|
2006
|
Engineering design
|
B
|
Methanol Works
|
|
|
|
|
1
|
Methanol plant
|
Zhongan Joint Coalification Co., Ltd.
|
1700
|
Basic Design
|
In Process
|
2
|
Methanol plant
|
Zhongtian Hechuang Energy Co., Ltd.
|
3600
|
Basic Design
|
In Process
|
3
|
Methanol plant
|
Chongqing Kabelo Chemical Co., Ltd.
|
850
|
Engineering Design
|
2014
|
4
|
Methanol plant
|
SINOPEC Sichuan Vinylon Factory
|
770
|
Engineering design
|
2010
|
5
|
Methanol plant
|
Chongqing Chemical and Pharmaceutical Holding (Group) Company
|
850
|
Engineering design
|
2010
|
6
|
Methanol plant
|
Zhongtian Hechuang Co., Ltd
|
4200
|
Feasible study
|
2007
|
7
|
Methanol plant
|
Joint Venture of Mitsubishi Gas and Chongqing Chemical and Pharmaceutical Company
|
850
|
Feasible study
|
2005
|
Basic design
|
8
|
Methanol plant
|
Yumen Petroleum Administrative Bureau
|
150
|
Feasible study
|
2005
|
Engineering design
|
C
|
Hydrogen production works
|
|
|
|
|
1
|
150 Thousand ton / year Coal Hydrogen Production Project
|
SINOPEC LUOYANG branch
|
200000Nm³/h
|
Feasible study
|
In Process
|
2
|
ZRCC Hydrogen Production Raw Material Structure Adjustment Renovation Project
|
SINOPEC ZRCC branch
|
100000Nm³/h
|
Engineering Design
|
In Process
|
3
|
Yangtze Petrochemical Coal to Gas Project -Phase II
|
SINOPEC Yangtze Petrochemical Company Branch
|
70000Nm³/h
|
Engineering Design
|
In Process
|
4
|
Baling (Branch) Company newly added 60000tons/year Hydrogen from Coal Production Line
|
Sinopec Baling (Branch) Company
|
92000Nm³/h
|
Engineering Design
|
In Process
|
5
|
Sino-Kuwait Joint-venture Guangdong Refinery Integration Project
|
Headquarters of Sino-Kuwait Joint-venture Guangdong Refinery Integration Project
|
200000Nm³/h
|
Foundation design
|
In Process
|
6
|
130,000 BiaoLi/hour of Coking Coal Hydrogen Production Device
|
SINOPEC Tianjing branch
|
130000Nm³/h
|
Feasible study
|
2015
|
7
|
20 million tons of Vadinar Refinery Hydrogen Production from Coal tar Project
|
India Elsa Petroleum Company
|
200000Nm³/h
|
Feasible study
|
2015
|
8
|
Coal (refinery coke) hydrogen production
|
SINOPEC Maoming Company Branch
|
200000Nm³/h
|
Feasible study
|
2014
|
Engineering design
|
9
|
Hydrogen from Coal Project
|
Sinopec Jiujiang Company
|
100000Nm³/h
|
Overall Design
|
2014
|
10
|
Hydrogen from Coal Project
|
Sinopec Jingmen (Branch) Company
|
150000Nm³/h
|
Feasibility Study
|
2013
|
11
|
Hydrogen from Coal Project
|
Sinopec Guangzhou Petrochemical Company
|
70000Nm³/h
|
Feasibility Study
|
2009
|
12
|
YARACO H2 output
|
Yangtze Acetyl Chemical Co., Ltd
|
|
Front end
|
2008
|
Engineering design
|
13
|
Hydrogen production plant
|
SINOPEC Qingdao Refining Company
|
30000Nm³/h
|
Engineering design
|
2007
|
14
|
Light naphtha modified plant
|
SINOPEC Qingdao Refining Company
|
350
|
Engineering design
|
2007
|
D
|
Other
|
|
|
|
|
1
|
Coal-based synthesis oil
|
Inner Mongolia Yitai Coal to Oil Co., Ltd
|
160
|
Engineering design
|
2008
|
2
|
Dimethyl ether
|
Zhongtian Hechuang Co., Ltd
|
3000
|
Feasible study
|
2007
|
3
|
Oil products synthesis GTL Pilot
|
SINOPEC ZRCC
|
10t/d
|
Engineering design
|
2006
|